黑料社区

Saudi Aramco, GE to install first wind turbine in 黑料社区

Saudi Aramco, GE to install first wind turbine in 黑料社区
GE
Updated 10 June 2016

Saudi Aramco, GE to install first wind turbine in 黑料社区

Saudi Aramco, GE to install first wind turbine in 黑料社区

JEDDAH: Saudi Aramco and GE are partnering to install 黑料社区鈥檚 first Wind Turbine at the Turaif Bulk Plant, located in the north-west of the Kingdom.
The initiative is in line with Saudi Vision 2030 as endorsed by the Saudi Cabinet that has set an initial target of generating 9.5 gigawatts (GW) of renewable energy.
The project marks the first regional installation of GE鈥檚 ground-breaking model 2.75-120 Wind Turbine, which has been specifically customized for the Kingdom鈥檚 climatic conditions.
GE鈥檚 Wind Turbine is a digital industrial solution that draws on the Industrial Internet platform by analyzing tens of data points every second to achieve higher levels of energy output and greater operational efficiency.
Abdulaziz Al-Judaimi, vice president of Power Systems, Saudi Aramco, said: 鈥淲e are committed to efficiently meeting the Kingdom鈥檚 energy demand through our fuel optimization program and by supporting renewable energy development. The demo installation of GE鈥檚 Wind Turbine will enable the Saudi Aramco and GE teams to build expertise in executing wind projects in the Kingdom.鈥
Hisham Albahkali, GE鈥檚 president & CEO for 黑料社区 and Bahrain, said: 鈥淭he installation of GE鈥檚 Wind Turbine by Saudi Aramco, our long-term partner, underlines our commitment to promoting renewable energy in the Kingdom. This state-of-the-art wind turbine is designed for challenging conditions. Building on our global operating experience in desert areas, we have worked with Saudi Aramco鈥檚 team to customize the turbine and optimize its performance for the Kingdom. This is a strong example of how we work with our partners to meeting the goals outlined in Saudi Vision 2030.鈥
Several studies have confirmed the potential for wind energy generation in the Kingdom, particularly in the northern region.
According to the Renewable Energy Atlas, higher wind speeds near 8.0 m/s and above (well above a standard economic viability speed of approximately 6 m/s) occur in the northeast and central regions of 黑料社区, as well as near mountains in the western region.
The demo Wind Turbine to be installed at Turaif bulk plant will allow the displacement of diesel that is used for power generation in the plant.
The wind turbine features a 120-meter rotor in combination with the proven single-blade pitch control.
The 2.75-120 offers the latest enhancements in load management controls, low acoustic emissions, efficient electrical power conversion and robust performance.
GE, recently, announced the launch of 10 initiatives with strategic partners including Saudi Aramco, that support the goals of Saudi Vision 2030, including economic diversification, localized manufacturing, human capital development as well as productivity and efficiency enhancement across the energy, aviation, health care and digital sectors. In the energy field, GE and Saudi Aramco hope to continue working together to scale renewable energy in 黑料社区 in pursuit of Saudi Vision 2030.